New custom home with walkout basement Completed in 2021, this spacious new 4600 sq/ft custom home located in Shelter Bay features a walkout basement; timber frame detailing; […]
Full step code level 4 construction design/build with legal secondary suite. Energy efficient structure with 2800 sq./ft. total living space, garage, carport, and deck. Features include […]
It was designed specifically to incorporate roof mounted solar panels that compliment the energy efficient home. This included the roof angle design and orientation on the […]
Location: Upper Arrow Heights Full custom build of this Upper Arrow Heights property completed over seven and a half months in 2009 with a call back […]
Kevin Arndt and Dr. Sara Brown NEEDED – Interior and exterior photos Framing some concrete Windows I finished the interior framing Completed full basement Downstairs: All […]
Full gutting and renovation back to finished drywall for this two-story residence on 9th Street in Revelstoke. Interior completely stripped to studs with layout reconfigured to […]
Revelation lodge Digging foundation Set grades Foundation work, foundations, walls and piers Beam work Exposed decking ceiling Insullated roof Framing interior Stairs, floor, exterior walls, All […]
RMR Guest Services + Retail Interior framing Cabinet install subbing and install Drywall Hung all doors and finishing All rough framing and drywall for the entire […]
Year completed: 200? 2nd story addition 8 rooms Time for completion: Roof additions, porch additions, siding, hot tub additions, Complete second story addition and interior/exterior finishing […]